Majestic 40 at Gardener's Ridge

building a Wisdom Majestic in North Kellyville


5 Comments

Phase One Landscaping

Phase One is nearly complete with the concrete side path going in today. I was up for both the sunrise and the concrete truck at 7am. There was no hanging around and the path took shape very quickly.

Prepped road base, reo & formwork:

RHS path formwork collage

 

RHS Path complete Collage

We have gone for a plain charcoal concrete path rather than the uber spray coated fleck we have on the driveway. The difference should not be so noticeable as it will be behind the gate.

I was keen to maybe liven it up with some leaf imprints and the odd gum nut impression as seen at King’s Park Botanical Gardens in Perth but decided plain was easiest in the end.

leaf prints Collage

The LHS double brick retaining wall is in and due to be rendered next week and then that will be phase one complete.

GR 16-04-16 010

Our cheapo postbox pole has died a death and the post box now lives on the garden waste bin. After a quick quote from the landscaper they bricked up a permanent one on Friday all ready for the renderer. This entailed me doing a quick tour of the neighbourhood before breakfast to see what everyone else had chosen followed by a trip to Masters and Bunnings to choose the fittings. Notice I didn’t say a quick trip as it took me awhile to choose but I’m pleased with what I came away with in the end.

letterbox Collage

I had already taken delivery of a house sign that will go on the letterbox to the left of the fittings. True to form after browsing the internet I chose the bees knees.

signage

Then after I picked myself off the floor at the price I chose a more modest sign off Groupon. A bit chalk and cheese but I like the overall look it will give.

Blankwall signage

We’ve received our irrigation quote and walked through what we want in phase two of the landscaping. Hopefully that quote will arrive this weekend.

When we were discussing our irrigation requirements I asked for it to be run off our recycled water system. So when he went to test the water pressure he pointed out that I don’t actually have a recycled water meter.

No 7 Willandra Cres recycled water 001

So much for me being observant, I thought I’d covered all the bases at PCI and handover!