19-09-17 Pool electrics and equipment installed
13-09-17 Pool & alfresco pavers laid
11-09-17 Pool pavers screed laid
08-09-17 Pool surround pavers and equipment slab concrete laid
23-08-17 Pool coping and tiling finished
10-07-17 Pool concreted
27-06-17 Steel work
22-06-17 Pool excavated
21-06-17 Pool peg out
13-03-17 Pool contract signed
24-03-16 Maintenance Inspection
17-03-16 Landscaping phase 1 started
10-03-16 13 week Maintenance Issues List submitted
05-01-16 Driveway sealant redone – again
28-01-16 Driveway sealant re-done
20-01-16 Driveway spray coated & sealed
11-12-15 Handover
03-12-15 NBN
01-12-15 PCI
27-11-15 Fly screens & doors in
27-11-15 Driveway saw cut
26-11-15 Carpet fitted
26-11-15 Driveway poured
25-11-15 Rain garden corrected
23-11-15 Driveway formwork
18-11-15 House clean
14-11-15 Cooker Hood fitted
14-11-15 Door furniture & bathroom fittings
13-11-15 Air con
11-11-15 Painters back to finish
09-11-15 Walls made good
07-11-15 Glass splashback fitted
05-11-15 Master robe, WIP & Cloak fit out
04-11-15 Tilers finish main floor
02-11-15 Tilers start main floor
30-10-15 Shower screens & mirrors fitted
20-10-15 Baths, toilets, taps & shower rails installed
19-10-15 Main floor tiles delivered
16-10-15 Rain Tank installed
16-10-15 Electrical fit off
14-10-15 Store, linen, Bed 2, Bed 3 & 4 WIR wire shelf fit outs
09-10-15 Acid wash bricks
08-10-15 Tilers back for wet areas
29-09-15 Benchtops in, sinks and basins in
25-09-15 Painting starts
19-09-15 Tiler starts wet areas
18-09-15 All wet area cabinetry in
18-09-15 Waterproof inspection passed
17-09-15 Gas connected & tiles delivered
14-09-15 Kitchen & Butler’s in
14-09-15 Waterproofing
11-09-15 Cabinetry delivered
08-09-15 Doors on & Lock out
07-09-15 Garage door
04-09-15 Staircase
03-09-15 Cornice
01-09-15 Progress Payment 20% Commencement of Linings
26-08-15 Gyprock
25-08-15 Lower eaves completed
20-08-15 Independent pre-lining inspection
18-08-15 Insulation
17-08-15 Gas fireplace fitted
15-08-15 Lower downpipes fitted
14-08-15 Electrical rough in
12-08-15 Air Con
12-08-15 Lower roof Colorbond
01-08-15 Lower roof fascia & guttering
29-07-15 Scaffolding removal & re-erected for Alfresco roof
24-07-15 Wisdom Landscaping meeting on site
09-07-15 Progress Payment 20% Bricks
07-07-15 Acid wash first floor bricks
02-07-15 Colorbond main roof on
25-06-15 Colorbond roof & sarking delivered
22-06-15 Guttering & fascia delivered
12-06-15 Progress Payment 20% Frame
11-06-15 Scaffolding erected
03-06-15 GraniteGuard termite protection
02-06-15 Houspect framing inspection
02-06-15 Bricking commences
01-06-15 Bricks delivered
27-05-15 Framing finished
19-05-15 GF frames up
16-05-15 Framework delivered
13-05-15 Progress Payment 25% Slab
08-15th Storm water drains completed
05-05-15 Power pole re-sited
05-05-15 Houspect slab inspection
02-05-15 Slab laid!
01-05-15 Waffle pods & reo laid
30-04-15 Internal Plumbing
29-04-15 Piering & form work
08-04-15 Site Fencing & scrape
01-04-15 April Fool’s Day – the portaloo!
26-03-15 File passed to Production Estimating team
Admin complete
19-03-15 Bank mortgage approved
02-03-15 End Panel signed off
26-02-15 End Panel issued
23-02-15 Construction plans signed off
16-02-15 Construction plans issued
11-02-15 Site pegged
30-01-15 Signed off Draft End Panel
16-01-15 Draft End Panel received
14-01-15 CDC compliance checked
09-01-15 TECK approval
19-12-14 CDC Approval
18-12-14 Submitted for CDC approval
03-12-14 updated Wisdom landscape plans accepted
25-11-14 CDC plans – final version
20-10-14 CDC plans – version 1
16-10-14 BAL Risk Assessment
02-10-14 Land settled
25-09-14 Mortgage signed & sealed
23-09-14 Timpelle kitchen plans accepted
19-09-14 Wisdom Landscaping quote accepted
17-09-14 Land registered
05-09-14 Di Lorenzo carpet & tile quote accepted
01-09-14 Land surveyed
18-08-14 Clipsal electrical
18-08-14 Di Lorenzo tiles appointment
15-08-14 Air con appointment
13-08-14 Timpelle kitchen appointment
13-08-14 Internal/external colours appointment
13-08-14 Wisdom Landscaping
11-08-14 Contract signed
07-08-14 Plans v3
04-08-14 Plans v2
14-07-14 Tender v7
11-07-14 Tender v5 & v6
02-07-14 Tender v4
05-06-14 First set of plans
01-05-14 Tender accepted
26-04-14 Tender v3
15-04-14 Tender v2
07-03-14 Tender Presentation
08-01-14 Request tender from Wisdom
20-12-13 Wisdom deposit paid
04-10-13 Gardener’s Ridge land deposit paid
14-09-13 Gardener’s Ridge land reserved
February 12, 2015 at 01:59
So which roof colour did you choose? Nice pegs!
February 12, 2015 at 11:34
Thanks Johanne!
I fancy Colorbond ‘Paperbark’ from their Classic Range as I wanted a light coloured roof but I’ve only seen it on one other house.
I can’t include pictures in my comments so I have updated my Exterior Colours page to show the house which influenced my choice. The PGH bricks and colorbond colours are the actual ones used in this house.
February 13, 2015 at 19:34
Hi Lunar62
How exciting. We are a long way from there. We just got out quotation today.
Did your builder provide for dirt removal, or have you got that responsibility to remove it. Have they given you any indication on how much dirt will be required to be removed ?.
Thanks
February 14, 2015 at 18:07
Hi Linda,
Yes Wisdom will remove/ fill for a price over the 500mm cut & fill they include in their site costs.
They all charge quite heftily for removal as it costs them to dispose of it. Now that we are going split level but raising the rear garden we probably won’t need that much removed.
Hope your tender was good are you pleased with it?
February 17, 2015 at 13:04
Yes got our quotation back on Friday. Still going over it. They do not take away the dirt. So a little worried how much there will be. They have quoted $4950 for the rain garden and they take the dirt from that. They have allowed 60 lineal meters for piers, hope that’s enough. Its scary at the beginning cause your not sure of what they are going to find. Also the BAL rating is worrying me. Cause if it comes back high it just increases costs.
Who did you get a quote from for your Stainless steel stacker sliding doors from Wisdom ? MDJ do not include blinds or screens. Had an estimate for Crimsafe, I nearly fell over.
February 17, 2015 at 13:35
Good news that you have your quotation now. We should get MDJ to do our rain garden as yours is less expensive 🙂 Does yours include plants and stones etc? Couldn’t believe it when ours didn’t. It really is a pain in the proverbial.
Good luck with your BAL rating are you in the process of getting a BAL report done?
We are BAL12.5 and the bits that hurt are the sliding/stacking screens as you have discovered. I don’t know who Wisdom use for them but we have just gone for what ever they offer but improved the locks. We didn’t go for gutter guard through them as it was rather pricey so we have parked that for the time being.
We are off to the pool show this weekend to get some ideas and costings … and then an inflatable paddling pool probably 🙂
February 17, 2015 at 14:38
Good luck with the pool show. We are a long way off that. We are to exchange on the land this Friday. With Settlement being 16.3.15. Just that my hubby is a triple checker with prices, before we go ahead. God help me if things don’t come to my estimates lol.